Sovena USA - Logoplaste 2010 & 2012 Manufacturing

Sovena USA - Logoplaste 2010 & 2012

Rome, New York

Construction Notes

Sovena USA – LogoPlaste, Tank Storage, Truck Docks & LogoPlaste Expansions 2010 & 2012 – 14,000 SF & 1,600 SF($1.1M Total)
Project Manager:
Lucas Saltsman
Superintendent: Luke Hamm



Logoplaste, Tank Storage, Truck Docks – 14,000 SF
Our first Major project for Sovena USA at their Production and Distribution facility at Griffiss Tech Park in Rome, NY.The project consists of (3) separate areas to accommodate (2) Tractor Trailer bays, an area for (6) large stainless steel Tanks and a Production area for plastic bottle production.
The project was completed through the winter of 2009/2010

LogoPlaste Expansion – 1,600 SF
We followed in 2012 with a small, but full 30’ height addition to accommodate the expanded LogoPlaste plastic bottle production area. We managed to fit this 14’ wide expansion between the railroad tracks and the existing building.