Empire Recycling Corporation
A 7,000 sf Butler building to house bulk aluminum for processing by a new shredding machine,
was completed in 2007. The project included installation of over (230) wood and steel piles to
support both the building and the exterior equipment. Following completion of the piles, we installed
over (230) cy of concrete for building and equipment foundations, as well as structural slabs.
The Load Out building featured a 30' eave height, clear span, with 12' high concrete and steel protection walls.
Upon completion of the building, we also completed a re-siding project of the original storage buildings to
match the look of the new building.
Project Manager: Lucas Saltsman
|