CREE MVF FAB - CUB

August 27, 2020

CREE MVF FAB - CUB image

Structural concrete package for an approx. 130,000 square-foot, two-level Central Utility Building for the new wafer Fabrication Facility in Marcy, with room for a boiler, chiller, electrical systems and other infrastructure. It will support the main Fab and Admin through an above-ground utility trestle. Along with the main CUB building are a Loading Dock, Trestle Foundations, Cooling Tower Foundations and an Exterior Truck Offload Containment area.