Construction Notes

Meadows at Middle Settlement Senior Apartments Phase 1 ($16.5 M) 55,000 SF
Project Manager:
Rob Munson
Assistant Project Manager: Jonah Schaaf
Superintendent: Jim Post



“The Meadows” is a multi-phase project demolished 14 of the 22 existing buildings on the site, and have been replaced by (3) three new buildings comprised of 93 units (84 1-bedroom and 9 2-bedrooms) and (1) new 5,500 SF Community Center. The buildings are three-story, double-loaded corridor, and elevator served. The redevelopment will replace all current studio/efficiency units with one-bedroom units and is the first phase of a multi-Phase Project.