This 5,000 sf expansion to the Tractor-Trailer maintenance building was completed through
the winter of 2006 and 2007. A design-build project, we worked with Wal-Mart corporate to
complete the design which involved working over existing utilities and coordination with on-going operations.
The building utilized a new integral slab sealer known as Petrotex to prevent oil penetration. Existing mechanical
and electrical systems were extended to the new addition.
* Further information about this and other Butler Design-Build projects can be obtained by
contacting David L. Kleps, Vice President of the Design-Build Butler Building Department.
|