Located on Bennett Street, this 7,300 SF addition is now the main entrance for
Faxton Hospital. This addition features multiple registration and admitting stations,
opposite a large waiting area, along with a new gift shop and complete snack bar
station. Since this is the main entrance, a new elevator links this addition to
the existing 4 floors of the hospital. This facility was constructed of a structural
steel frame with masonry veneer. The project was completed with a total construction
time of approximately 11 months.
Project Manager: Brett Babicz
Superintendent: Ron Hrynuk
|
|