A 5,300 SF addition was added as a change order to the Main Entrance Addition.
This addition took the place of the Hospital's courtyard and was added between
the Main Entrance Addition and 3 other existing Hospital buildings. It features
a 500 SF prefabricated therapy pool with a full skylight above, along with men's
& women's shower rooms.
This facility was constructed of a structural steel frame with EIFS veneer. Unique
to this project was the mechanical system which features a dehumidification unit
that makes the area comfortable for both patients and staff. The addition was
completed with a total construction time of 7 months. This project is the first
of its kind for Faxton-St. Lukes Healthcare.
Project Manager: Brett Babicz
Superintendent: Ron Hrynuk
|
|