The Temper Mill Foundation project consisted of a 480 yard concrete equipment
foundation. There were 22 different elevations and 236 anchor bolts, which all
had to be set to a 1/16" tolerance. The project was completed in 6 weeks
with a 7 man crew and no remedial work was required.
Project Manager: Bill Diehl
Superintendent: Jim Post
|
|