| |
Located on the Erie Canal in North Utica, this 8,000 SF two-story marina is an
ideal stopping point for boaters on the canal. This building has toilet facilities
and a picnic area. Recently a restaurant has taken the building for year-round
use. The building is built on a mat foundation with large retaining walls. The
frame is structural steel with brick masonry on all sides with wood trusses and
asphalt shingles. The building is serviced with an elevator.
Project Manager: John Sabotka
Superintendent: Jim Post
|
|