The People
View All People
Ronald J. Hrynuk
General Superintendent
Overview
Ron began working for Gaetano in 1994 as a journeyman carpenter. In 1999 he received his first assignment as foreman on the Faxton Regional Center Project. In 2001 he became the superintendent on the New Entrance / Elevator Tower Project at Faxton Hospital when the project superintendent was transferred to another project. When this project was 75% complete the owner decided to build an enclosed Therapy Pool in an existing courtyard adjacent to the on going project. Due to the logistics, excavation work, concrete and structural steel was an enormous challenge to the young superintendent, however he was able to overcome all obstacles he encountered and at the end delivered a very successful project.
Key Projects
FSLH Imaging Center, Utica, NY
This 5,800 SF renovation was completed in 4 months on a Design-Build basis. The new space includes state of the art Digital Mammography, Ultrasound, Bone Densitometry & Stereotactic Biopsy imaging service Project Value $700,000
Utica City School, Albany Elementary School, Utica, NY
Renovations and additions to the existing grade school. The first Phase involved a new 1 story 8,000 SF kindergarten addition, a new rear three story masonry stair tower and a new bus loop. A complete renovation to the existing cafeteria as well as a new roof. Phase 2 included complete classroom renovations with new smart boards, a new Library, all new VCT floor throughout and the creation of a new entry. Project Value $3.7M
SUNY Morrisville-Oneida Hall, Morrisville, NY
Complete renovation of a 1960's Dormitory that included upgrades to the bathroom facilities, interior finishes, window replacement, electrical systems and addition of a new fire protection sprinkler system and new sidewalks. Project Value $3.9 M
Little Falls Hospital, Little Falls, NY
Renovation of the existing Emergency Department, 3rd Floor Patient Rooms, Ground Floor Reception area as well as a new covered handicapped accessible entrance way. Cost $2.9 Million
Price Chopper - North Utica, NY
60,000 square-foot renovation / expansion to existing store. Cost $3.8 Million
Faxton / St. Luke's Rehabilitation Renovations Faxton Campus
Extensive renovations and structural work on two floors. Total square-feet 22,000. Cost $1.9 Million
Faxton / St. Luke's Renovations & Addition to Medical Records - St. Luke's Campus
2000 square-foot 2-story vertical addition and renovations to 3000 square-feet of existing space. Cost $.5 Million
Faxton / St. Luke's Renovation to Dialysis and Imaging Units - Faxton Campus
Cost $1.5 Million
Faxton / St. Luke's Addition & Renovations to Centrex Labs - St. Luke's Campus
3000 square-foot vertical addition and extensive renovations to 9000 square-feet of existing space for new laboratory space for Centrex Labs. Cost $2.2 Million
Faxton / St. Luke's Renovation to Endoscopy Suites - St. Luke's Campus
Cost $.7 Million
Continuing Education/Training
- Class of 1981 Adirondack High School / Lewis County BOCES (Carpentry)
- Builders School, US Navy SeaBees, Port Huzneme, CA
- OSHA 30 Hour Course
- ASHE Health Care Construction Certification (Infectious Control Regulations)
Affiliations
- US Navy SeaBees, 1981-1986